Skip to main content
Penyaskito Blog

Main navigation

  • Home
Language switcher
  • English
  • Español
User account menu
  • Log in

Breadcrumb

  1. Home

i18n

By penyaskito, 14 June, 2012

Drupal D8MI Sprint: Day 3

So third day of the Sprint, with Peter, Clemens and I working on Gettext. It would be the last day for Clemens, so we expected to do great advances :-)

Day started great, and I don't get stuck like previous days with obvious things. We kept with the refactoring and finally core/includes/gettext.inc could be removed. w00t!

Thanks to Gábor's explanation we understood what was expected for the batch API part of this, so we are able of advancing on that, but maybe on another issue context. This one became too big and splitting it could be of help. Peter wrote some more integration tests, and I finished fixing plurals handling and cleaning up some methods. Thanks Clemens for your patience, and hope that we can advance without you in the next days!

Tags

  • Drupal
  • D8MI
  • contributing
  • sprint
  • Barcelona
  • initiatives
  • Drupal Core
  • i18n
  • patches
By penyaskito, 14 June, 2012

Drupal D8MI Sprint: Day 2

Ok, so I failed on Tuesday on updating the blog, but a quick summary.

Clemens and I kept working on the Gettext component on D8MI sandbox. I got a little lost and we had an Skype call in the morning were he explained me what he was expecting. We did some clean up and kept working on it. Some commits got into the sandbox, but lot of works still remaining. Fortunately, in the afternoon Attiks joined us, so more hands (and brain) on code!

Tags

  • Drupal
  • D8MI
  • contributing
  • sprint
  • Barcelona
  • initiatives
  • Drupal Core
  • i18n
  • patches
By penyaskito, 12 June, 2012

Drupal D8MI Sprint: Day 1

Today, the D8MI sprint started. Met the assistants.

At 10 am, Gábor introduced the multilanguage architecture for Drupal 8. It's composed of four layers, with the locale module at the base, and on top of it the UI, the content translation and the config translation. He presented the people responsible of each so we know who we need to talk for anything, and how we could work on his D8MI sandbox. After this, the presentation round where everyone exposed the areas he was interested.

As planned, I started helping out Clemens with the Gettext .po file generation.  The morning has been quite frustrating. I catched up with the comments, and saw that it was not an easy thing. Clemens and Erik have most of the issue already working, but some problems appeared when I tried to test it, and Clemens helped out to find the causes. We updated the summary accordingly. After that, I headed with some errors because of inconsistent naming of classes and its references, an issue that was not happening on Clemens' Mac computer. Fixing this was my first commit to the sandbox :D 

After dinner, work started to happen smoothly. Clemens was working with plurals and we discussed how the responsability of formatting those should be out of the PoItem object, and with his change on this implementation the tests went back to green :-)

After some silly issues that I had generating a git patch, I started to feel more confident. While Clemens update the issue summary for showing up the change of scope it had through the comments, I started to think on how to refactor PoDatabaseWriter. This should continue tomorrow.

Gábor is reporting the progress at this document: D8MI sprint report. The global balance of the 1st day is only one commit to 8.x, but it seems that code will flow better on next days. By now, it's being an awesome experience working with these folks.

Tags

  • Drupal
  • D8MI
  • contributing
  • sprint
  • Barcelona
  • initiatives
  • Drupal Core
  • i18n
  • patches
By penyaskito, 11 June, 2012

Drupal D8MI Sprint: Day 0

Today I landed in Barcelona. I'll be spending a full week trying to contribute to the D8MI. D8MI stands for Drupal 8 Multilanguage Initiative. In Drupal core development, most of it is grouped under different core initiatives, where there is one or more leads that organize the work on a particular area.

The D8MI is lead by Gabor Hojtsy, who set up a sprint this week at Barcelona for advancing on this, taking care of having a workplace and getting sponsorship for commodities so people can focus on work. Current focus is described at Multilingual focus issues.

I found that a sprint is a great way of getting involved, so I decided to spend my holidays here. It's also a great opportunity for visiting friends like @francisrivilla who hosts me these days.

Going back to the sprint, I'll try to write up my experience here every day. As a newbie, I expect to pair with someone more experienced on first days and on following days try to work on my own. Clemens Tolboom is not at the city, but he proposed starting with Make gettext .po generation its own abstracted functionality and offered to mentor online. Let's see how this evolves. Wish me luck!

Tags

  • Drupal
  • D8MI
  • contributing
  • sprint
  • Barcelona
  • initiatives
  • Drupal Core
  • i18n
i18n

Monthly archive

  • April 2025 (1)
  • July 2023 (1)
  • December 2021 (1)
  • May 2021 (2)
  • April 2021 (1)
  • September 2014 (1)
  • November 2012 (1)
  • September 2012 (2)
  • August 2012 (3)
  • June 2012 (6)

Recent content

Optimizing PhpStorm when it's slow or hangs
4 weeks ago
Introducing The Dashboard Initiative
1 year 9 months ago
Rewriting history on a git repository for editing author and email on past commits
3 years 4 months ago

Recent comments

I would recommend taking a…
1 year 8 months ago
This looks interesting
1 year 9 months ago
Thanks for the comment
3 years 11 months ago

Blogs I follow

  • Mateu Aguiló "e0ipso"
  • Gábor Hojtsy
  • Pedro Cambra
  • The Russian Lullaby, davidjguru
  • Can It Be All So Simple
  • Maria Arias de Reyna "Délawen"
  • Matt Glaman
  • Daniel Wehner
  • Jacob Rockowitz
  • Wim Leers
  • Dries Buytaert
Syndicate

Footer

  • Drupal.org
  • LinkedIn
  • GitHub
  • Mastodon
  • Twitter
Powered by Drupal